Stages of the construction process
It is essential to take into account all aspects of building your dream home, not just the financial aspects. As a long-term investment, construction should not be taken lightly. Once built, it cannot be modified or changed frequently. In other words, you will have to pick every single building material carefully, such as bricks, TMT bars, cement, etc.
Building a strong foundation is essential. TMT bars play a crucial role in keeping concrete together, so choosing the right one is vital.
Understanding the various phases of house construction is essential when building a new home. If you need to ensure you are in synchronization with the construction process, this is essential. We will look at the phases of home construction with the most reliable TMT bar in Tamil Nadu. This will be from the beginning of house development to receiving the keys to your new home. The following are some phases of building a house:
-
Study of Locations
House construction begins with the preparation and excavation of the site. If necessary, you may need to do some grounding off or leveling at the beginning. To layout the location’s floor plan, the site must be cleared, ready, and leveled. Rather than seeing the floor plan just on paper, you will have the opportunity to witness it in action – an exciting first time!
-
Pavement for the floor
The next phase of the housing development will be the introduction of solid floors. Your architects will confirm how the foundation will be dug, confined, and emptied. Forms and plumbing will be organized before the main solid floor section is poured.
-
Designing a Roof & Floor Structure
After the concrete is restored, work will be started on the main portion of the house, perhaps the most exciting part of building a house. It depends on your strategy for home construction whether India has a wide range of techniques for construction or whether this stage changes. It is very vital to select the right TMT bar, brick, steel, timber, concrete, and so on, for your construction at this stage. Upon completion of the construction of the ceiling and wall structure, the roof will be fitted and waterproofed.
-
External Textures
The exterior wall will be completed according to the house construction strategy you choose. Solid walls, such as concrete, brick, or block, will require you to paint and finish the outer walls. However, in the case of light materials, such as wood or steel, protection is also necessary, for example, by using wooden boards. At the beginning of the project, you should ensure the contractor used the best grade of TMT bar as per the agreed upon contract, since this will be the root of the building.
-
Doorways and windows
Now that the heavy work has been completed, it is safe to install the doors and windows. Thus, the building is completely water-tight and safe from all the elements that could cause problems in construction. The builders can now concentrate on the inner areas of the building, such as plumbing, electrical, and finishing.
-
Uneven fittings
The pipelines and electric wires will be installed by plumbers and electricians. Wires and cables will not be connected to the live sources until an expert connects them. Therefore, the construction will be treated as uneven. Experts will connect the switches, electrical plugs, lights, wires, and all of the required things as soon as they arrive. However, for now, they will leave the pipes and wires extending from the walls, which will be completed later.
-
Internal works
Work on the non-constructional interior walls and floor tiles will begin once the pipes and wires have been installed. In addition to plastering, tiling, painting, and fitting finished floors, the architect will design the home’s interior, and its flooring. Carpenters will build the furniture in the home. During this phase of the building, cabinet makers will build kitchen cabinets and room closets.
Execution & Delivery with Constructive Intent
Your last chance to see the builder’s shortcomings and have them corrected is at the point of completion, where your home is finished. You will visit the property with the constructor and make a final inspection. This will ensure everything has run smoothly and the work has been completed as agreed. After all the completions, this is the moment you’ve been waiting for! You have been waiting for this second! You will receive the keys to your new home after the constructor has corrected all your issues.
Right now, we are about to reach the point where we will complete your home’s construction. Keep in mind that the materials and methods used for building construction and the builders you hire may affect this order. Therefore, choose very carefully. These are some very common stages of the construction process.